Fenaka Power Station

Fenaka Power Station

Heenaa Goalhi, Sh. Milandhoo

About

The Fenaka power station on Heenaa Goalhi generates electricity for Milandhoo. A new 1,200 kW generator was being installed in September 2026, and 2,500 kWh of battery storage is being added under the ADB-funded ASSURE project. It's a couple of minutes' walk from Milandhoo School.

#power station#electricity#utility#fenaka

Key facts

New generator
1,200 kW (being installed, Sept 2026)1
Battery storage
2,500 kWh under the ADB-funded ASSURE project2
Battery contractor
JV of Shijiazhuang Kelin Electric, Gordian Nanjing Automation and Sino Soar Hybrid (Beijing) Technology2
ASSURE funder
Asian Development Bank (USD 75.5 million programme)3
Installed capacity
1,724 kW from 3 generator sets4
Peak load
891 kW4
Electricity connections
5244
Solar hybrid (ADB POISED)
247 kWp solar, 280 kWh battery, 400 kW generator5
  1. 1standard.mv
  2. 2edition.mv
  3. 3psmnews.mv
  4. 4fenaka.mv
  5. 5adb.org
  1. Now
  2. 2026
  3. September 2026· 2 months ago

    1,200 kW generator being installed

    Fenaka reported it was installing a 1,200 kW generator at Milandhoo as part of capacity upgrades across the atolls.

    standard.mv
  4. 2025
  5. 7 April 2025

    Battery storage announced

    The government said Sh. Milandhoo will get a 2,500 kWh battery energy storage system, part of 38 MWh across 18 islands under the ASURE project, to use more solar power.

    plus.mv
  6. 2022
  7. 2022

    Solar-diesel hybrid system

    By July 2022 Milandhoo had a solar-diesel hybrid power system built under the ADB-funded POISED project (Preparing Outer Islands for Sustainable Energy Development): 247 kWp of solar panels, a 280 kWh battery and a 400 kW diesel generator.

    adb.org
  8. 2021
  9. 31 March 2021

    700 kW generator being installed

    President Solih said a 700 kW generator set was being installed in Milandhoo and that another 800 kW set would be added.

    raajje.mv
  10. 2020
  11. 30 November 2020

    New fuel tank

    Fenaka tendered building a fuel tank at the Milandhoo powerhouse on 30 November 2020 and re-tendered it on 24 January 2021 because the first notice drew too little response.

    gazette.gov.mv
  12. 2019
  13. 22 December 2019

    Powerhouse wall, panel room and chimney

    Fenaka tendered building a boundary wall for the powerhouse, a high-voltage panel room, a chimney and workshop works on 22 December 2019, and re-tendered them on 7 January 2020 because the first notice drew too little response.

    gazette.gov.mv
  14. 20 December 2019

    Moving the fuel tank

    Fenaka tendered moving an existing fuel tank at Milandhoo to a new site on 20 December 2019 and re-tendered the work on 7 January 2020 because the first notice drew too little response.

    gazette.gov.mv
  15. 19 September 2019

    Store room area works

    Fenaka tendered all the works for the store room area on 19 September 2019 and re-tendered them on 9 October 2019 because the first notice drew too little response.

    gazette.gov.mv

Reviews

No reviews yet. Been here? Be the first to share how it was.

Rate Fenaka Power Station

Sign in with Telegram to write a review — it keeps reviews real. One tap, no password.

Been here? Add your photos Help other visitors see what Fenaka Power Station is like.

Photos of Fenaka Power Station

Sign in with Telegram to share photos — one tap, no password. We’ll tell you on Telegram when they’re added.

More in Community